Deucalion Docs
How-to guideA task-oriented guide for completing a specific goal.
admindashboardanalyticsdata-qualityworkforceppm

Using Operations Dashboards

Use Dashboard, Data Quality, Workforce Productivity, and PPM Forecast to find operational pressure and open the desk that owns the fix.

Before you start

  • The workspace has live operational, CRM, scheduling, report, or finance data.
  • You understand which desk owns each record type.
  • Analytics and scheduler capabilities are enabled where needed.

Expected outcome

Office teams can triage commercial, data-quality, workforce, and future-capacity pressure without editing records from the wrong surface.

Start on Dashboard

  1. Open Dashboard.
  2. Review urgent operational and commercial cards first.
  3. Open the owning desk from the card rather than trying to fix the summary.
  4. Use quote, work-order, finance, inspection, defect, and scheduling links to continue the workflow.

The dashboard includes commercial finance attention such as accepted quotes not invoiced, completed work orders not invoiced, overdue invoices, PO blockers, and credit-hold accounts. It also includes sent quote aging, so old sent quotes do not disappear from daily triage.

Use Data Quality for record hygiene

  1. Open Data Quality.
  2. Check Open Issues, Critical, Warnings, and Active Rules.
  3. Review rule coverage badges to see which rules are enabled by current workspace capabilities.
  4. Open each sample from the owning rule.
  5. Fix the source record in the owning desk.
  6. Mark the sample reviewed only when it has genuinely been handled.

Data Quality currently checks:

RuleOwner
Missing Site LocationSites
Sites Without AssetsAssets
No Billing ContactCustomers
Routine Scope GapsRoutines
Stale Open DefectsDefects
Draft Report QueueReports
Draft Handover PackagesClient Handover
CRM Link MismatchCustomers

Rules that depend on CRM or Reports are disabled when that workspace capability is not available.

Use Workforce Productivity for aggregate delivery review

  1. Open Workforce Productivity.
  2. Choose 30 Days, 90 Days, or This Month.
  3. Review completed jobs, assets inspected, late or rebooked jobs, and QA follow-up.
  4. Use the engineer table to compare completed work, job split, average hours, acknowledgement rate, late or rebooked counts, and QA counts.
  5. Drill into Jobs or QA from the table.

Workforce Productivity is an aggregate management surface. Use it to find patterns, then open Scheduling, Work Orders, Inspections, or Defects for source-level correction.

Use PPM Forecast for future workload

  1. Open PPM Forecast.
  2. Review the 12-month volume and estimated-hours charts.
  3. Check unassigned and bucketed workload.
  4. Review service-line pressure, regional load, and site load.
  5. Drill into Scheduling from the month, service line, region, or site.

PPM Forecast uses future inspections, work orders, and planner tasks. It is most useful when target-month work and generated routine work are maintained honestly.

Fix in the owning desk

SignalOwning desk
Missing postcode or geocodeSites
Empty asset registerAssets or Systems
Billing contact gapCustomers
Routine scope or generation blockerCustomers, then Scheduler
Stale defectDefects, then Quotes or Work Orders
Draft handover packageClient Handover
Accepted quote not invoicedQuotes, then Finance
Completed work order not invoicedWork Orders, then Finance
Late or rebooked jobsScheduling
QA follow-upDefects or Inspections

Troubleshooting

ProblemWhat to check
A dashboard looks emptyCheck workspace capability, role, and whether the source desk has matching data.
Data Quality marks a rule disabledThe required workspace capability is not enabled.
Workforce numbers look lowCheck the selected date range and whether work is completed inside that period.
PPM Forecast has no future workloadConfirm work has future scheduled dates or target months.
A summary card seems wrongOpen the owning desk first; dashboards are derived surfaces.

Reference surfaces

  1. Use Dashboard, Data Quality, Workforce Productivity, and PPM Forecast for route-level details.
  2. Use the Admin Route Interaction Matrix to decide which desk owns the next action.

On this page